Log in

Stockton water towers to receive new look

Pat Hindman
Posted 1/31/24

The Stockton north water tower (no. 3) will soon be transformed from the picture on the left to the picture on right. The board recently accepted the bid from Maquire Water to repaint both the north and south towers inside and out for a cost of over $500,000. The north tower will be painted first and have the design of the picture on the right. The south tower (no. 4) near the schools will be painted later with a design reflecting a school logo.

This item is available in full to subscribers.

Please log in to continue

Log in


X
X